Problem #3: Given that the design speed is 90 km/hr and the minimum clearing distance above the shown underground tunnel

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Problem #3: Given that the design speed is 90 km/hr and the minimum clearing distance above the shown underground tunnel

Post by answerhappygod »

Problem 3 Given That The Design Speed Is 90 Km Hr And The Minimum Clearing Distance Above The Shown Underground Tunnel 1
Problem 3 Given That The Design Speed Is 90 Km Hr And The Minimum Clearing Distance Above The Shown Underground Tunnel 1 (15.45 KiB) Viewed 31 times
Problem #3: Given that the design speed is 90 km/hr and the minimum clearing distance above the shown underground tunnel should be at least 1 meter, then: Design the vertical curve connecting between the two grades such that the pavement should be at least above the top of the tunnel by I meter PVT PVC St El 77 be G14 St. 21235m 26425 Tunnel PW 51.2358.5 m L26025 RASE
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply