Problem #3: Given that the design speed is 90 km/hr and the minimum clearing distance above the shown underground tunnel
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Problem #3: Given that the design speed is 90 km/hr and the minimum clearing distance above the shown underground tunnel
Problem #3: Given that the design speed is 90 km/hr and the minimum clearing distance above the shown underground tunnel should be at least 1 meter, then: Design the vertical curve connecting between the two grades such that the pavement should be at least above the top of the tunnel by I meter PVT PVC St El 77 be G14 St. 21235m 26425 Tunnel PW 51.2358.5 m L26025 RASE