Q4. Determine the most economical section of a rectangular channel carrying water at the rate of 0.4 m3 /s; The bed sl
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Q4. Determine the most economical section of a rectangular channel carrying water at the rate of 0.4 m3 /s; The bed sl
Q4. Determine the most economical section of a rectangular channel carrying water at the rateof 0.4 m3/s; The bed slope of the channel being 1 in 2000. Take Chezy’s constant C = 50.