Q4. Determine the most economical section of a rectangular channel carrying water at the rate of 0.4 m3 /s; The bed sl

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Q4. Determine the most economical section of a rectangular channel carrying water at the rate of 0.4 m3 /s; The bed sl

Post by answerhappygod »

Q4. Determine the most economical section of a rectangular channel carrying water at the rateof 0.4 m3/s; The bed slope of the channel being 1 in 2000. Take Chezy’s constant C = 50.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!