QUESTION 3 3.1 A time study of a finishing operation yielded the following observed times for one element (element C) of
QUESTION 3 3.1 A time study of a finishing operation yielded the following observed times for one element (element C) of a job with a performance rating of 90%. There is an allowance of 17% for this operation. Element C Observed Times: Observation Time (minutes) 1 9 2 9 32 32 In dovolaning standard. 8 4 10 5 11 3.1.1 Calculate the observed time for element C. 3.1.2 Calculate the normal time for element C. 3.1.3 Calculate the allowance time for element C. 3.1.4 Calculate the standard time for element C. 6 8 7 8 8 9 9 12 10 7 Total 91 (2