QUESTION 3 3.1 A time study of a finishing operation yielded the following observed times for one element (element C) of

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

QUESTION 3 3.1 A time study of a finishing operation yielded the following observed times for one element (element C) of

Post by answerhappygod »

Question 3 3 1 A Time Study Of A Finishing Operation Yielded The Following Observed Times For One Element Element C Of 1
Question 3 3 1 A Time Study Of A Finishing Operation Yielded The Following Observed Times For One Element Element C Of 1 (37.75 KiB) Viewed 25 times
QUESTION 3 3.1 A time study of a finishing operation yielded the following observed times for one element (element C) of a job with a performance rating of 90%. There is an allowance of 17% for this operation. Element C Observed Times: Observation Time (minutes) 1 9 2 9 32 32 In dovolaning standard. 8 4 10 5 11 3.1.1 Calculate the observed time for element C. 3.1.2 Calculate the normal time for element C. 3.1.3 Calculate the allowance time for element C. 3.1.4 Calculate the standard time for element C. 6 8 7 8 8 9 9 12 10 7 Total 91 (2