- Actual Capacity A T1 T2 T3 Ha Hr 14 Using The Specifications Of The Transmission System Of The Metering Devise Horizo 1 (15.88 KiB) Viewed 35 times
Actual Capacity= A/T1+T2+T3=ha/hr 14. Using the specifications of the transmission system of the metering devise (horizo
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Actual Capacity= A/T1+T2+T3=ha/hr 14. Using the specifications of the transmission system of the metering devise (horizo
Actual Capacity= A/T1+T2+T3=ha/hr 14. Using the specifications of the transmission system of the metering devise (horizontal seed plate) of the two-row corn planter, determine the expected hill spacing. Row spacing= 75 cm, groundwheel diameter = 60 cm, no. of cells of seedplate=20, T1 = 6t, T2 = 18t, T3= 10t and T4 = 25t. a.0.62 m b.0.81 m c.0.71m d.0.92 m