Actual Capacity= A/T1+T2+T3=ha/hr 14. Using the specifications of the transmission system of the metering devise (horizo

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Actual Capacity= A/T1+T2+T3=ha/hr 14. Using the specifications of the transmission system of the metering devise (horizo

Post by answerhappygod »

Actual Capacity A T1 T2 T3 Ha Hr 14 Using The Specifications Of The Transmission System Of The Metering Devise Horizo 1
Actual Capacity A T1 T2 T3 Ha Hr 14 Using The Specifications Of The Transmission System Of The Metering Devise Horizo 1 (15.88 KiB) Viewed 36 times
Actual Capacity= A/T1+T2+T3=ha/hr 14. Using the specifications of the transmission system of the metering devise (horizontal seed plate) of the two-row corn planter, determine the expected hill spacing. Row spacing= 75 cm, groundwheel diameter = 60 cm, no. of cells of seedplate=20, T1 = 6t, T2 = 18t, T3= 10t and T4 = 25t. a.0.62 m b.0.81 m c.0.71m d.0.92 m
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply