3. A contractor has compacted the base course for a new road and found that the mean value of the test samples has the m

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

3. A contractor has compacted the base course for a new road and found that the mean value of the test samples has the m

Post by answerhappygod »

3 A Contractor Has Compacted The Base Course For A New Road And Found That The Mean Value Of The Test Samples Has The M 1
3 A Contractor Has Compacted The Base Course For A New Road And Found That The Mean Value Of The Test Samples Has The M 1 (34.06 KiB) Viewed 39 times
3. A contractor has compacted the base course for a new road and found that the mean value of the test samples has the moisture content = 14.6%, specific gravity = 2.81, and bulk soil weight = 18.2 kN/ m². The specifications require that the void ratio should not exceed 0.80. Check whether the contractor met the specifications or not? Clearly highlight each step and state your answer with numerical proofs. Answer: e = 0.74, satisfactory
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply