3. A contractor has compacted the base course for a new road and found that the mean value of the test samples has the m
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
3. A contractor has compacted the base course for a new road and found that the mean value of the test samples has the m
3. A contractor has compacted the base course for a new road and found that the mean value of the test samples has the moisture content = 14.6%, specific gravity = 2.81, and bulk soil weight = 18.2 kN/ m². The specifications require that the void ratio should not exceed 0.80. Check whether the contractor met the specifications or not? Clearly highlight each step and state your answer with numerical proofs. Answer: e = 0.74, satisfactory