Problem 1 The labor and material cost for a riprapping work is as follows: Labor: Materials: (For every 1 cu. m. volume)

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Problem 1 The labor and material cost for a riprapping work is as follows: Labor: Materials: (For every 1 cu. m. volume)

Post by answerhappygod »

Problem 1 The Labor And Material Cost For A Riprapping Work Is As Follows Labor Materials For Every 1 Cu M Volume 1
Problem 1 The Labor And Material Cost For A Riprapping Work Is As Follows Labor Materials For Every 1 Cu M Volume 1 (221.38 KiB) Viewed 60 times
Problem 1 The labor and material cost for a riprapping work is as follows: Labor: Materials: (For every 1 cu. m. volume) 1 Foreman @ P500.00 per hour Cement = 3 bags @ P150.00 per bag 1 Skilled Worker @ p40.00 per hour Sand = 0.25 cu. m. @P300.00 per cu. m. 5 Unskilled Workers @ P35.00 per hour Boulder = 1 cu. m. @P250.00 per cu. m. The accomplishment of the above laborers is 0.45 cubic meter per hour. Profit, overhead and miscellaneous expenses is 30% of the labor and material cost. Value Added Tax (VAT) is 10% of the labor cost. a) Determine the labor cost per cubic meter. b) Determine the cost of materials per cubic meter. c) Give the total cost of riprapping per cubic meter.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply