Problem 1 The labor and material cost for a riprapping work is as follows: Labor: Materials: (For every 1 cu. m. volume)
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
Problem 1 The labor and material cost for a riprapping work is as follows: Labor: Materials: (For every 1 cu. m. volume)
Problem 1 The labor and material cost for a riprapping work is as follows: Labor: Materials: (For every 1 cu. m. volume) 1 Foreman @ P500.00 per hour Cement = 3 bags @ P150.00 per bag 1 Skilled Worker @ p40.00 per hour Sand = 0.25 cu. m. @P300.00 per cu. m. 5 Unskilled Workers @ P35.00 per hour Boulder = 1 cu. m. @P250.00 per cu. m. The accomplishment of the above laborers is 0.45 cubic meter per hour. Profit, overhead and miscellaneous expenses is 30% of the labor and material cost. Value Added Tax (VAT) is 10% of the labor cost. a) Determine the labor cost per cubic meter. b) Determine the cost of materials per cubic meter. c) Give the total cost of riprapping per cubic meter.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!