- Problem 1 The Labor And Material Cost For A Riprapping Work Is As Follows Labor Materials For Every 1 Cu M Volume 1 (221.38 KiB) Viewed 61 times
Problem 1 The labor and material cost for a riprapping work is as follows: Labor: Materials: (For every 1 cu. m. volume)
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Problem 1 The labor and material cost for a riprapping work is as follows: Labor: Materials: (For every 1 cu. m. volume)
Problem 1 The labor and material cost for a riprapping work is as follows: Labor: Materials: (For every 1 cu. m. volume) 1 Foreman @ P500.00 per hour Cement = 3 bags @ P150.00 per bag 1 Skilled Worker @ p40.00 per hour Sand = 0.25 cu. m. @P300.00 per cu. m. 5 Unskilled Workers @ P35.00 per hour Boulder = 1 cu. m. @P250.00 per cu. m. The accomplishment of the above laborers is 0.45 cubic meter per hour. Profit, overhead and miscellaneous expenses is 30% of the labor and material cost. Value Added Tax (VAT) is 10% of the labor cost. a) Determine the labor cost per cubic meter. b) Determine the cost of materials per cubic meter. c) Give the total cost of riprapping per cubic meter.