An activity has a planned duration of 10 days and a float of 5 days, after updating the schedule it was found that it ha

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

An activity has a planned duration of 10 days and a float of 5 days, after updating the schedule it was found that it ha

Post by answerhappygod »

An Activity Has A Planned Duration Of 10 Days And A Float Of 5 Days After Updating The Schedule It Was Found That It Ha 1
An Activity Has A Planned Duration Of 10 Days And A Float Of 5 Days After Updating The Schedule It Was Found That It Ha 1 (71.91 KiB) Viewed 37 times
An activity has a planned duration of 10 days and a float of 5 days, after updating the schedule it was found that it has started as scheduled, the elapsed duration is 7 days until the current data date and the remaining duration is 7 days. What could be the current float of the activity? (3/3 Points)