1. 1 An order-of-magnitude cost estimate should be accurate to within the following percentages of the actual cost a. 5%

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

1. 1 An order-of-magnitude cost estimate should be accurate to within the following percentages of the actual cost a. 5%

Post by answerhappygod »

1 1 An Order Of Magnitude Cost Estimate Should Be Accurate To Within The Following Percentages Of The Actual Cost A 5 1
1 1 An Order Of Magnitude Cost Estimate Should Be Accurate To Within The Following Percentages Of The Actual Cost A 5 1 (24.5 KiB) Viewed 40 times
1 1 An Order Of Magnitude Cost Estimate Should Be Accurate To Within The Following Percentages Of The Actual Cost A 5 2
1 1 An Order Of Magnitude Cost Estimate Should Be Accurate To Within The Following Percentages Of The Actual Cost A 5 2 (24.5 KiB) Viewed 40 times
1 1 An Order Of Magnitude Cost Estimate Should Be Accurate To Within The Following Percentages Of The Actual Cost A 5 3
1 1 An Order Of Magnitude Cost Estimate Should Be Accurate To Within The Following Percentages Of The Actual Cost A 5 3 (24.5 KiB) Viewed 40 times
1 1 An Order Of Magnitude Cost Estimate Should Be Accurate To Within The Following Percentages Of The Actual Cost A 5 4
1 1 An Order Of Magnitude Cost Estimate Should Be Accurate To Within The Following Percentages Of The Actual Cost A 5 4 (16.48 KiB) Viewed 40 times
1. 1 An order-of-magnitude cost estimate should be accurate to within the following percentages of the actual cost a. 5% b. 10% e. 15% d. 20% 2. The total mechanical and electrical unit costs for a library are listed as $40 per square foot, while total project cost is estimated at $119 per square foot, based on these values. the percentage of total costs represented by mechanical and electrical costs is closest to : *a. 21% b. .29% c. 34% d. 38% 3. The cost of constructing an 8000ft2 warehouse was $400,000. The ENR construction cost index was 6770 at that time. The cost of constructing a similar building using an ENR index of 9088 is closest to: a. less than $450,000 b. $537,000 c. $672,000 d. more than $700,000
4. The cost for 200-horsepower (hp) pump, with controller, is $ 22,000. The cost estimate of a similar pump pf 300hp capacity, provided the exponent in the cost-capacity equation is 0.64, is closest to: *a. $12,240 b. $28,520 c. $33,780 d. $39,550