1 1 An Order Of Magnitude Cost Estimate Should Be Accurate To Within The Following Percentages Of The Actual Cost A 5 1 (24.5 KiB) Viewed 41 times
1 1 An Order Of Magnitude Cost Estimate Should Be Accurate To Within The Following Percentages Of The Actual Cost A 5 2 (24.5 KiB) Viewed 41 times
1 1 An Order Of Magnitude Cost Estimate Should Be Accurate To Within The Following Percentages Of The Actual Cost A 5 3 (24.5 KiB) Viewed 41 times
1 1 An Order Of Magnitude Cost Estimate Should Be Accurate To Within The Following Percentages Of The Actual Cost A 5 4 (16.48 KiB) Viewed 41 times
1. 1 An order-of-magnitude cost estimate should be accurate to within the following percentages of the actual cost a. 5% b. 10% e. 15% d. 20% 2. The total mechanical and electrical unit costs for a library are listed as $40 per square foot, while total project cost is estimated at $119 per square foot, based on these values. the percentage of total costs represented by mechanical and electrical costs is closest to : *a. 21% b. .29% c. 34% d. 38% 3. The cost of constructing an 8000ft2 warehouse was $400,000. The ENR construction cost index was 6770 at that time. The cost of constructing a similar building using an ENR index of 9088 is closest to: a. less than $450,000 b. $537,000 c. $672,000 d. more than $700,000
4. The cost for 200-horsepower (hp) pump, with controller, is $ 22,000. The cost estimate of a similar pump pf 300hp capacity, provided the exponent in the cost-capacity equation is 0.64, is closest to: *a. $12,240 b. $28,520 c. $33,780 d. $39,550
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!