A firm wants to build mini hydro power plant and pumped storage hydroelectricity system. Flowrate is assume 100 l/s. The

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A firm wants to build mini hydro power plant and pumped storage hydroelectricity system. Flowrate is assume 100 l/s. The

Post by answerhappygod »

A Firm Wants To Build Mini Hydro Power Plant And Pumped Storage Hydroelectricity System Flowrate Is Assume 100 L S The 1
A Firm Wants To Build Mini Hydro Power Plant And Pumped Storage Hydroelectricity System Flowrate Is Assume 100 L S The 1 (127.74 KiB) Viewed 98 times
A firm wants to build mini hydro power plant and pumped storage hydroelectricity system. Flowrate is assume 100 l/s. The pipes are build from Carbon Steel (Cement-lined). a) Calculate the total pump head for the given system. For this system, static head is 15 m, and pump is 2 meter above the suction side. - 17 m- - 5 m - - 4 m Steel pipe NB 250 mm Pump Info water temp 20°C -17. Steel pipe NB 225 mm shuuustossa bend 45° i Turbine Info -5m- Kfoot valve 0.25 3 Kcontrol valve Kbend 45 0.2 0.2 Kbend 45 Kreducer 0.04 0.04 Kreducer Area reducer (m²) 0.0314 Area reducer (m²) 0.0176 1.56 outlet loss K diffuser v²/2g Kbend 90 0.3 0.3 Kbend 90 Knon return valve 0.5 1.3 Kinlet outlet loss v²/2g inlet loss v²/2g b) For the pump system, considering positive suction head, what should be maximum suction lift theoretically?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply