24. For the following intersection and phase scheme, assume the effective greens are as follows: phase 1: 35 sec 국 fo ph

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

24. For the following intersection and phase scheme, assume the effective greens are as follows: phase 1: 35 sec 국 fo ph

Post by answerhappygod »

 1
1 (95.2 KiB) Viewed 12 times
24. For the following intersection and phase scheme, assume the effective greens are as follows: phase 1: 35 sec 국 fo phase 2: 25 sec Phase 1 Phase 2 Phase 3 Phase 4 phase 3: 15 sec phase 4: 40 sec Assume further that there are no pedestrians. If the lost time per phase is 4 seconds and the clearance interval (yellow plus all-red) is 5 seconds, determine the actual green (ga) for: phase 1: phase 2: phase 3: phase 4:
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply