24. For the following intersection and phase scheme, assume the effective greens are as follows: phase 1: 35 sec 국 fo ph
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
24. For the following intersection and phase scheme, assume the effective greens are as follows: phase 1: 35 sec 국 fo ph
24. For the following intersection and phase scheme, assume the effective greens are as follows: phase 1: 35 sec 국 fo phase 2: 25 sec Phase 1 Phase 2 Phase 3 Phase 4 phase 3: 15 sec phase 4: 40 sec Assume further that there are no pedestrians. If the lost time per phase is 4 seconds and the clearance interval (yellow plus all-red) is 5 seconds, determine the actual green (ga) for: phase 1: phase 2: phase 3: phase 4: