blackboard.h attps:... Bb https:... Goog... Big P... Stake... tutor... 15. Given the following project (all times are in

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

blackboard.h attps:... Bb https:... Goog... Big P... Stake... tutor... 15. Given the following project (all times are in

Post by answerhappygod »

Blackboard H Attps Bb Https Goog Big P Stake Tutor 15 Given The Following Project All Times Are In 1
Blackboard H Attps Bb Https Goog Big P Stake Tutor 15 Given The Following Project All Times Are In 1 (122.93 KiB) Viewed 79 times
1. Draw an AON network of this project.
2. Identify ES, EF, LS, LF times of this project network.
3. What is the project duration?
4. What is the optimal way to cut the project duration by 1 day?
What is the project cost then?
blackboard.h attps:... Bb https:... Goog... Big P... Stake... tutor... 15. Given the following project (all times are in days): Pre- decessor Activity Crash Crash Time Cost a с Normal Normal Time Cost 5 $50 4 40 7 70 2 20 3 30 80 50 60 $150 200 160 50 d а, с au bo w Nou e a, c b wael-anw 8 g d e, 290 100 180