The correct answer is 173.10 Bags of Cement. I only need the full solution with illustrations.

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

The correct answer is 173.10 Bags of Cement. I only need the full solution with illustrations.

Post by answerhappygod »

The correct answer is 173.10 Bags of Cement. I only needthe full solution with illustrations.
The Correct Answer Is 173 10 Bags Of Cement I Only Need The Full Solution With Illustrations 1
The Correct Answer Is 173 10 Bags Of Cement I Only Need The Full Solution With Illustrations 1 (115.77 KiB) Viewed 64 times
The Correct Answer Is 173 10 Bags Of Cement I Only Need The Full Solution With Illustrations 2
The Correct Answer Is 173 10 Bags Of Cement I Only Need The Full Solution With Illustrations 2 (37.69 KiB) Viewed 64 times
Compute how many 40kg bags of cement is needed for provided framing plan. Column- Tie Beam Roof Deck Slab Slab on Fill Roof Beam Footing 6 meters Square Footing: 1.20 m X 250mm thick. Class A Square Column: 250mm X 6.00m height (4 columns at 6x6 square floor area). Class A Tie Beam: 250mm width X 350mm ht (all sides). Class A Slab on Fill: 150mm thick. Class C 250mm width X 450mm ht (all sides). Class A Roof Beam: Roof Deck Slab: 200mm thick (on top of Roof Beam). Class A
Concrete Proportion Mixture Class AA A B C Proportion 1 1 1/2 3 1: 2:4 1 2 1/2 5 1:36 Cement in Bag 40kg 12 9 7.5 6 50gk 9.5 7 6 5 Sand cu.m. 0.50 0.50 0.50 0.50 Gravel cu.m. 1.00 1.00 1.00 1.00