ACTIVITY A. EXCAVATION/STEEL BAR PREPARATION B. FOOTING REBAR INSTALLATION C. POUR CONCRETE FOR FOOTING D. COLUMN BARS/

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

ACTIVITY A. EXCAVATION/STEEL BAR PREPARATION B. FOOTING REBAR INSTALLATION C. POUR CONCRETE FOR FOOTING D. COLUMN BARS/

Post by answerhappygod »

Activity A Excavation Steel Bar Preparation B Footing Rebar Installation C Pour Concrete For Footing D Column Bars 1
Activity A Excavation Steel Bar Preparation B Footing Rebar Installation C Pour Concrete For Footing D Column Bars 1 (68.77 KiB) Viewed 34 times
ACTIVITY A. EXCAVATION/STEEL BAR PREPARATION B. FOOTING REBAR INSTALLATION C. POUR CONCRETE FOR FOOTING D. COLUMN BARS/ FORMWORKS E. POUR CONCRETE FOR COLUMN F. FLOOR/WALL G. ROOF FRAME H. ROOFING I. FINISHING PREDE- CESSOR A B B,C D D E E E.F.H DURATION ES EF LS LF S (DAYS) 2 1 3 3 3 3 3 1 3 REQUIRED: 1. PREDECESSOR DIAGRAM (AON) I 2. FILL UP (ES.EF.LS.LF.S) CHART 3. GANTT CHART 4. INTERPRET RESULT ES= S LS- A GANTT CHART 1 2 3 4 5 6 7 8 9 1 0 D EF= NAME OF ACTIVITY LF- 1 1 1 2 S = LS-ES OR S=LF - EF 1 3 1 4 EF = ES + DURATION (FORWARD PASS) LS LF- DURATION (BACKWARD PASS) 15 1 1 5 6 1 1 78