TUTORIAL 4 An hydro-electric project has the following data: Catchment area, A = 5x10⁹ m²; Annual rainfall, F = 1.25m; M

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

TUTORIAL 4 An hydro-electric project has the following data: Catchment area, A = 5x10⁹ m²; Annual rainfall, F = 1.25m; M

Post by answerhappygod »

Tutorial 4 An Hydro Electric Project Has The Following Data Catchment Area A 5x10 M Annual Rainfall F 1 25m M 1
Tutorial 4 An Hydro Electric Project Has The Following Data Catchment Area A 5x10 M Annual Rainfall F 1 25m M 1 (134.93 KiB) Viewed 38 times
TUTORIAL 4 An hydro-electric project has the following data: Catchment area, A = 5x10⁹ m²; Annual rainfall, F = 1.25m; Mean head, H = 30m yield factor, K = 80% Overall efficiency, overall = 70% NB: The yield factor expresses the amount of rainfall that can be utilized since part of the rainfall is lost by evaporation and soil infiltration. 2021/05/19 a) Calculate the annual average power in kW that can be generated [Ans: 32648 kW] b) If the load factor is 40%, determine the rating of generators installed [Ans: 81620 kW]
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply