A construction project requires a concrete mix with proportions of 1.3.2:4.3 as cement, sand, gravel, on a weight basis.

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A construction project requires a concrete mix with proportions of 1.3.2:4.3 as cement, sand, gravel, on a weight basis.

Post by answerhappygod »

A Construction Project Requires A Concrete Mix With Proportions Of 1 3 2 4 3 As Cement Sand Gravel On A Weight Basis 1
A Construction Project Requires A Concrete Mix With Proportions Of 1 3 2 4 3 As Cement Sand Gravel On A Weight Basis 1 (26.2 KiB) Viewed 30 times
A construction project requires a concrete mix with proportions of 1.3.2:4.3 as cement, sand, gravel, on a weight basis. The following is available information Determine the water/cement ratio of the concrete mix in gal/sack. Cement content weight per yd' = 4.9 sacks/yd & Specific gravity= 3.2 Sand: SSD with specific gravity (SG) = 2.63 Gravel: SSD with specific gravity (SG) = 2.56 A. 6 B. 8 C. 5 D. 7
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!