7. A transfer line with 34 stations has an ideal cycle time of 0.65 minutes, an average downtime of 8.6 minutes per line

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

7. A transfer line with 34 stations has an ideal cycle time of 0.65 minutes, an average downtime of 8.6 minutes per line

Post by answerhappygod »

7 A Transfer Line With 34 Stations Has An Ideal Cycle Time Of 0 65 Minutes An Average Downtime Of 8 6 Minutes Per Line 1
7 A Transfer Line With 34 Stations Has An Ideal Cycle Time Of 0 65 Minutes An Average Downtime Of 8 6 Minutes Per Line 1 (12.94 KiB) Viewed 12 times
7. A transfer line with 34 stations has an ideal cycle time of 0.65 minutes, an average downtime of 8.6 minutes per line stop occurrence, and a station failure frequency of 0.02 for all stations After analysis, the system designer proposes to locate a storage buffor between stations 27 and 28 to improve linc efficiency. Determine: a) The current line efficiency and production rate marks/ b) The maximum possible line efficiency and production rate that would result from installing the proposed storage buffer. 17 marks)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply