Using the information provided in the table, the network diagram and the project completion time = 25 weeks, calculate t

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Using the information provided in the table, the network diagram and the project completion time = 25 weeks, calculate t

Post by answerhappygod »

Using The Information Provided In The Table The Network Diagram And The Project Completion Time 25 Weeks Calculate T 1
Using The Information Provided In The Table The Network Diagram And The Project Completion Time 25 Weeks Calculate T 1 (97.9 KiB) Viewed 38 times
Using the information provided in the table, the network diagram and the project completion time = 25 weeks, calculate the minimum time for completing the project possible. Normal Time (weeks) Crash Time (weeks) Normal Cost ($) Maximum weeks Reduced Crash Cost ($) Activity Crash Cost per Week ($) A 4 500 3 900 1 400 B 4 600 3 700 1 100 C с 6 800 1,300 3 167 D 6 1,500 4 2,150 2 325 E 1.750 4 2.250 N 250 F 5 1,200 5 1,200 0 0 G 6 1,500 4 1,800 2. 150 I 3 500 3 3 500 0 AON network diagram: B H Minimum project completion time = weeks