Need to find pcs(pieces), linear feet, and total Linear
feet.
4) Determine a takeoff of materials for storefront glass required for a building entrance (Refer Figure 4). (20 points) Find Aluminum tubing takeoff and glass opening takeoff (Ignore concrete column/beam materials) 3-2- 3'-0" 3'-0" 2-11" 6-2" 2-11" 3-0" + 2-11" 2-11" -- 0.6 5-0 -0-2 Concrete Figure 4
Pcs Linear Ft Length 10'-0" 3'-0" 2'-11" 3-2" 6-2" Total LF Aluminum Tubing Takeoff
4) Determine a takeoff of materials for storefront glass required for a building entrance (Refer Figure 4). (20 points)
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
4) Determine a takeoff of materials for storefront glass required for a building entrance (Refer Figure 4). (20 points)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!