The network diagram of a construction project is shown below with its three time estimates of each activity. Determine -

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

The network diagram of a construction project is shown below with its three time estimates of each activity. Determine -

Post by answerhappygod »

The Network Diagram Of A Construction Project Is Shown Below With Its Three Time Estimates Of Each Activity Determine 1
The Network Diagram Of A Construction Project Is Shown Below With Its Three Time Estimates Of Each Activity Determine 1 (62.45 KiB) Viewed 25 times
The network diagram of a construction project is shown below with its three time estimates of each activity. Determine - (i) The critical path and its standard deviation. (ii) Probability of completing the project in 40 days. (ii) The time duration at which 95% of the project work is likely to be completed 17 17 31 31 35 35 (3.5,13) (2, 4, 6) 7 0 0 1 5 5 (2,5,8) (8, 11, 20) 2 3 (4,7,16) 4.9, 20 5 17 17 (7, 10, 13) 3, 7, 17 15 19 2, 3, 10 27 27