2. been located, and the soils there have a swell rate of 25% and a shrinkage rate of 2ro. A proposed building site requires 2,000 ccy of imported fill. A suitable borte. How many cubic yards of soil must be trucked in from the borrow site?
2. been located, and the soils there have a swell rate of 25% and a shrinkage rate of 2ro. A proposed building site requ
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
2. been located, and the soils there have a swell rate of 25% and a shrinkage rate of 2ro. A proposed building site requ