You want to define virtual safety stock within PP/DS.Which statements correctly describe this kind of modeling?Note: The

Posted: Fri Aug 26, 2022 10:05 am
by answerhappygod
You want to define virtual safety stock within PP/DS.Which statements correctly describe this kind of modeling?Note: There are 3 correct answers to this question.

A. The virtual safety stock is only "virtually" visible for the MRP run and is not included in the pegging logic.
B. The virtual safety stock requires a separate PP/DS heuristic to become visible as a requirement during the MRP run.
C. The virtual safety stock is only considered in the dynamic pegging logic.
D. As soon as the material master has a safety stock value assigned, a virtual safety stock is considered during planning. E. The virtual safety stock logic can only be defined for an entire planning version.