You want to define virtual safety stock within PP/DS.Which statements correctly describe this kind of modeling?Note: The

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

You want to define virtual safety stock within PP/DS.Which statements correctly describe this kind of modeling?Note: The

Post by answerhappygod »

You want to define virtual safety stock within PP/DS.Which statements correctly describe this kind of modeling?Note: There are 3 correct answers to this question.

A. The virtual safety stock is only "virtually" visible for the MRP run and is not included in the pegging logic.
B. The virtual safety stock requires a separate PP/DS heuristic to become visible as a requirement during the MRP run.
C. The virtual safety stock is only considered in the dynamic pegging logic.
D. As soon as the material master has a safety stock value assigned, a virtual safety stock is considered during planning. E. The virtual safety stock logic can only be defined for an entire planning version.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply