You want to create one bill of material (BOM) to be used for several equipment master records. Therefore, you create a m
Posted: Fri Aug 26, 2022 10:05 am
You want to create one bill of material (BOM) to be used for several equipment master records. Therefore, you create a material BOM.In which field do you enter the corresponding material number to assign this material BOM to the equipment master record?
A. In the Structure Indicator field
B. In the Construction Type field
C. In the Order Type field
D. In the Usage Times field
A. In the Structure Indicator field
B. In the Construction Type field
C. In the Order Type field
D. In the Usage Times field