You want to create one bill of material (BOM) to be used for several equipment master records. Therefore, you create a m

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

You want to create one bill of material (BOM) to be used for several equipment master records. Therefore, you create a m

Post by answerhappygod »

You want to create one bill of material (BOM) to be used for several equipment master records. Therefore, you create a material BOM.In which field do you enter the corresponding material number to assign this material BOM to the equipment master record?

A. In the Structure Indicator field
B. In the Construction Type field
C. In the Order Type field
D. In the Usage Times field
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply