Assume that no additional product risks have been identified during the first week of test execution.Which of the follow

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Assume that no additional product risks have been identified during the first week of test execution.Which of the follow

Post by answerhappygod »

Assume that no additional product risks have been identified during the first week of test execution.Which of the following answers would you expect to best describe the residual risks associated with the identified product risks, at the end of the first week of test execution?Number of correct responses: 1 -K3 2 credits -
Assume That No  1
Assume That No 1 (3.56 KiB) Viewed 66 times
Assume That No  2
Assume That No 2 (23.16 KiB) Viewed 66 times
A. Since R3 is the only risk for which all test cases have passed, the risk has been reduced by 20%
B. The test execution status table indicates that the risk has been reduced by 56%
C. The residual risk level cant be determined, because it requires that all the test cases have been executed
D. The test execution table doesnt give an indication of the risk level of the open defects and the test cases that failed or are not run yet
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply