Which two command sequences must be configured on a switch to establish a Layer 3 EtherChannel with an open-standard pro

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Which two command sequences must be configured on a switch to establish a Layer 3 EtherChannel with an open-standard pro

Post by answerhappygod »

Which two command sequences must be configured on a switch to establish a Layer 3 EtherChannel with an open-standard protocol? (Choose two.)

A. interface GigabitEthernet0/0/1 channel-group 10 mode auto
B. interface GigabitEthernet0/0/1 channel-group 10 mode on
C. interface port-channel 10 no switchport ip address 172.16.0.1 255.255.255.0 Most Voted
D. interface GigabitEthernet0/0/1 channel-group 10 mode active Most Voted
E. interface port-channel 10 switchport switchport mode trunk
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply