On a network of one department, there are four PCs connected to a switch, as shown in the following figure: After the Sw

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

On a network of one department, there are four PCs connected to a switch, as shown in the following figure: After the Sw

Post by answerhappygod »

On a network of one department, there are four PCs connected to a switch, as shown in the following figure: After the Switch1 restarts. Host A (the host on the left) sends the first frame to Host C (the host on the right). What the first thing should the switch do?
On A Network Of 1
On A Network Of 1 (68.83 KiB) Viewed 50 times
A. Switch1 will add 192.168.23.12 to the switching table.
B. Switch1 will add 192.168.23.4 to the switching table.
C. Switch1 will add 000A.8A47.E612 to the switching table.
D. None of the above C
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply