MegaCorp is using SmartCenter Server with several gateways. Their requirements result in a heavy log load. Would it be f

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

MegaCorp is using SmartCenter Server with several gateways. Their requirements result in a heavy log load. Would it be f

Post by answerhappygod »

MegaCorp is using SmartCenter Server with several gateways. Their requirements result in a heavy log load. Would it be feasible to add the SmartEvent
Correlation Unit and SmartEvent Server to their SmartCenter Server?

A. No. SmartCenter SIC will interfere with the function of SmartEvent.
B. No. If SmartCenter is already under stress, the use of a separate server for SmartEvent is recommended.
C. No, SmartEvent and Smartcenter cannot be installed on the same machine at the same time.
D. Yes. SmartEvent must be installed on your SmartCenter Server.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply