Consider the following process flow: What is the problem with this flow?

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Consider the following process flow: What is the problem with this flow?

Post by answerhappygod »

Consider the following process flow:

What is the problem with this flow?
Consider The Fo 1
Consider The Fo 1 (27.1 KiB) Viewed 54 times
A. There is nothing wrong with this flow.
B. The exception handling in this flow can be removed because an Attach action in a navigate stage should always work if configured correctly
C. The Attach Block should be enlarged to also include the "˜Waited Long Enough?' decision stage.
D. The flow contains a recover stage and a route from it without a resume stage. This will cause internal error on future exceptions thrown in the same session.
E. The 0.5 second wait stage should be removed so that the retries can be performed at full speed.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply