If a Six Sigma project was to reduce repair station inventory and the team found the inventory was creeping up over time

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

If a Six Sigma project was to reduce repair station inventory and the team found the inventory was creeping up over time

Post by answerhappygod »

If a Six Sigma project was to reduce repair station inventory and the team found the inventory was creeping up over time which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?

A. Review the Visual Factory to assure inventory in excess of desired visible
B. Improve the lighting to assure adequate visibility
C. Analyze data from supplier deliveries
D. Reword the standardized work instructions to use active verbs and not passive phrases
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply