Please show work and steps. If an approach has a PHF of 0.90 and a counted hourly volume of 800 veh/hr what is the maxim

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Please show work and steps. If an approach has a PHF of 0.90 and a counted hourly volume of 800 veh/hr what is the maxim

Post by answerhappygod »

Please show work and steps.
If an approach has a PHF of 0.90 and a counted hourly
volume of 800 veh/hr what is the maximum 15-minute volume and peak
rate of flow?
What is the highest and lowest possible value of PHF?
At a given location, the space mean speed is measured as 70 mph
and the rate of flow as 2200 pc/h/ln. What is the density at this
location for the analysis period? How could you decrease the
density by 10%?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply