COURSE: GEOTECHNICS
please I need the answer within 1:30-2 hours maximum otherwiseit's not useful for me, Thank You
(c) The void ratio of the soil at a construction site is determined 0.92. The compaction work is carried out establish subgrade formation. The in place void ratio at the end of compaction was found 0.65. By assuming the moisture content remains unchanged, determine (i) Percent (\%) decreases in the total volume of the soil due to compaction. (4 marks) (ii) Percent (\%) increase in the field unit weight. (4 marks) (iii) Percent (%) change in the degree of saturation. (4 marks)
please I need the answer within 1:30-2 hours maximum otherwiseit's not useful for me, Thank You
(c) The void ratio of the soil at a construction site is determined 0.92. The compaction work is carried out establish subgrade formation. The in place void ratio at the end of compaction was found 0.65. By assuming the moisture content remains unchanged, determine (i) Percent (\%) decreases in the total volume of the soil due to compaction. (4 marks) (ii) Percent (\%) increase in the field unit weight. (4 marks) (iii) Percent (%) change in the degree of saturation. (4 marks)