COURSE: GEOTECHNICS please I need the answer within 1:30-2 hours maximum otherwise it's not useful for me, Thank You

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

COURSE: GEOTECHNICS please I need the answer within 1:30-2 hours maximum otherwise it's not useful for me, Thank You

Post by answerhappygod »

COURSE: GEOTECHNICS
please I need the answer within 1:30-2 hours maximum otherwiseit's not useful for me, Thank You
Course Geotechnics Please I Need The Answer Within 1 30 2 Hours Maximum Otherwise It S Not Useful For Me Thank You 1
Course Geotechnics Please I Need The Answer Within 1 30 2 Hours Maximum Otherwise It S Not Useful For Me Thank You 1 (63.79 KiB) Viewed 37 times
(c) The void ratio of the soil at a construction site is determined 0.92. The compaction work is carried out establish subgrade formation. The in place void ratio at the end of compaction was found 0.65. By assuming the moisture content remains unchanged, determine (i) Percent (\%) decreases in the total volume of the soil due to compaction. (4 marks) (ii) Percent (\%) increase in the field unit weight. (4 marks) (iii) Percent (%) change in the degree of saturation. (4 marks)