Problem 1: From the given table below, determine the following: 1. Determine the duration of the project. (5 Points) 2.
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
Problem 1: From the given table below, determine the following: 1. Determine the duration of the project. (5 Points) 2.
Problem 1: From the given table below, determine the following: 1. Determine the duration of the project. (5 Points) 2. Draw the network diagram (10 Points) 3. Determine the critical path and identify the critical activities (20 Points) Problem 2: From the data given in problem 1, tabulate the following: - ES, EF, LS and LF (15 Points) - The amount of float for each path and activity. (15 Points)