132kV 11kV 3.3kV E D C B 1 1 1 1 15,000 Meters 210mm Overhead Line 6.202 2.000 Meters 2407? Cable 0.2422 200 Meters 120m

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

132kV 11kV 3.3kV E D C B 1 1 1 1 15,000 Meters 210mm Overhead Line 6.202 2.000 Meters 2407? Cable 0.2422 200 Meters 120m

Post by answerhappygod »

132kv 11kv 3 3kv E D C B 1 1 1 1 15 000 Meters 210mm Overhead Line 6 202 2 000 Meters 2407 Cable 0 2422 200 Meters 120m 1
132kv 11kv 3 3kv E D C B 1 1 1 1 15 000 Meters 210mm Overhead Line 6 202 2 000 Meters 2407 Cable 0 2422 200 Meters 120m 1 (362.19 KiB) Viewed 36 times
132kv 11kv 3 3kv E D C B 1 1 1 1 15 000 Meters 210mm Overhead Line 6 202 2 000 Meters 2407 Cable 0 2422 200 Meters 120m 2
132kv 11kv 3 3kv E D C B 1 1 1 1 15 000 Meters 210mm Overhead Line 6 202 2 000 Meters 2407 Cable 0 2422 200 Meters 120m 2 (82.64 KiB) Viewed 36 times
How did we get the t which is 0.01?
132kV 11kV 3.3kV E D C B 1 1 1 1 15,000 Meters 210mm Overhead Line 6.202 2.000 Meters 2407? Cable 0.2422 200 Meters 120mm? Cable Fuses Type gG F 200A 132kV 0.0492 10MVA 0.29% R, CT, RCTI 1 A Rg CTT -XIAO 150/14 R2 CT XTTXT O 7500/54 250/5A If1 500/14 Source If5 If4 If3 If2 F: 150A Relays Plug Setting 30MVA 132/11kV 22.5% 4MVA 11/3.36V 7% Figure 1: Challenge Problem - Radial Network Diagram
Substation A Base Current Sbase I base 13 x V base 10x106 I base = = 1749.55 A V3 x 3.3x103 10x106 F.L = = 35.77 MVA 0.175+0.075+0.0033+0.0198+0.0036+0.0029 Fault Level Fault Current at 3.3KV Sbase F. L = Ztotal F.L If = V3 x Vbase I base le = X2 35.77 IF = 6258.13 A V3 x 3.3 1749.55 If = = 6257.33 A 0.2796 Fault Current at 3.3KV Fault Current at 11KV If = 6257.33x0.3 = 1877.2 A Pickup Current at 3.3KV 100 Ipickup = 250x = 250 A 100 3.3 lg = lfx 11 Ipickup PS% = x100 CTprimary IF PSM = Ipickup t = 0.4xt + 0.5 Plug Setting Multiplier (PSM) Operating Time 1877.2 PSM = = 7.5 250 t = 0.4x0.01 + 0.5 = 0.154 sec Time Multiplier Setting (TMS) PSM2 – 1 TMS = -xt 80 7.52 – 1 TMS = -x0.154 = 0.11 80