5. Set up and complete the level notes for a double-rodded line from BM10 to BM11. The following are the readings along

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

5. Set up and complete the level notes for a double-rodded line from BM10 to BM11. The following are the readings along

Post by answerhappygod »

5 Set Up And Complete The Level Notes For A Double Rodded Line From Bm10 To Bm11 The Following Are The Readings Along 1
5 Set Up And Complete The Level Notes For A Double Rodded Line From Bm10 To Bm11 The Following Are The Readings Along 1 (23.71 KiB) Viewed 36 times
5. Set up and complete the level notes for a double-rodded line from BM10 to BM11. The following are the readings along the high(H) route and the low(L) route, BS on BM1 = 1.750m, FS on TP1(H) = 2.043m, FS on TP1(L) = 2.010, BS on TP1(H) =1.932, BS on TP1(L) = 1.898, FS on TP2(H) = 1.845, FS on TP2(L) = 1.875, BS on TP2(H) = 2.150, BS on TP2(L) = 2.100, FS on TP3(H) = 1.510, FS on TP3(L) = 1.490, BS on TP3(H) = 2.090, BS on TP3(L) = 2.000 and FS on BM11 - 1.500m. Assume that the elevation of BM10 is 325.45 meters.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply