Question 3: During the construction of the Third Runway of Cairo International Airport, Two additional control points, A

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Question 3: During the construction of the Third Runway of Cairo International Airport, Two additional control points, A

Post by answerhappygod »

Question 3 During The Construction Of The Third Runway Of Cairo International Airport Two Additional Control Points A 1
Question 3 During The Construction Of The Third Runway Of Cairo International Airport Two Additional Control Points A 1 (73.19 KiB) Viewed 31 times
Question 3: During the construction of the Third Runway of Cairo International Airport, Two additional control points, A&B were required to be constructed and observed using a traverse linked to existing control points established by GPS i.e. GPS1 and GPS2 as shown in Figure. The coordinates of GPS and GPS, are (2357.655 m E,1835.522m N) & (1716.865m E, 1638.804m N), respectively. Find the angular, linear, relative closing errors also, find the adjusted coordinates of points A & B (standard deviation of observed angles 10"). Note that: Linked traverse, compute bearing for line GPS-GPS2 from given coordinates) 40°29'36" GPS1 GPS2 08.67 -S0,78 211 313.654m 350.045 m 111 08' 15" B 420.192 m Sla Ln FB-cor Disl. M ΔΕ AN DE SN Adj. AE E Observed Angles Adj. AN N Adjusted Angles GPS1 GPSI- GPS2 GPS2 65° 29' 30" GPS2-A A 111° 08' 15" AB B 112° 52' 059 B-GPSI GPSI 70° 29' 36