Material for an earth fill was available from three different borrow sites. In the compacted state, the fill measured 10
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
Material for an earth fill was available from three different borrow sites. In the compacted state, the fill measured 10
Material for an earth fill was available from three different borrow sites. In the compacted state, the fill measured 100,000 mº at a void ratio e = 0.70. The corresponding in-situ void ratio and cost (material and transportation) of the material for the three sites is as follows: Borrow Site 1 2 3 Void Ratio 0.8 1.7 1.2 Total Cost per Cubic Meter LE 12.80 LE 10.30 LE 12.00 Determine the most economical site.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!