Determine the optimum preventive maintenance frequency for each of the pieces of equipment If breakdown time is normally
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
Determine the optimum preventive maintenance frequency for each of the pieces of equipment If breakdown time is normally
Determine the optimum preventive maintenance frequency for each of the pieces of equipment If breakdown time is normally distributed: (Round "Probability Ratio" to 4 decimal places, and all other answers to 2 decimal places. Negative values should be indicated by a minus sign.) Use Table Average Time (days) Standard Equipment between Breakdowns Deviation 22 28 39 A201 3 BABC C850 Equipment A201 B400 C850 Preventive Maintenance cost 5270 $170 $520 Breakdown Cost $2,170 $3,470 $4,675 Click here for the Excel Deto File Equipment Probability Ratio Interval days) A201 B400 C850
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!