Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Borges Machine​ Shop, Inc., has a​ 1-year contract for the production of 225,000 gear housings for a new​ off-road vehic

Post by answerhappygod »

Borges Machine​ Shop, Inc., has a​ 1-year contract for the
production of 225,000 gear housings for a new​ off-road vehicle.
Owner Luis Borges hopes the contract will be extended and the
volume increased next year. Borges has developed costs for three
alternatives. They are​ general-purpose equipment​ (GPE), flexible
manufacturing system​ (FMS), and​ expensive, but​ efficient,
dedicated machine​(DM). The cost data​ follow: General-Purpose
Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated
Machine (DM)
Annual contracted units 225,000 225,000 225,000
Annual fixed cost $150,000 $250,000
$480,000
Per unit variable cost $15.00
$14.50 $13.75
Based on the​ cost, the process that is best suited for the
current contracted volume is ?