2. The times required to assemble a common circuit board at Strampen Board Corp. were measured. The production manager t

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

2. The times required to assemble a common circuit board at Strampen Board Corp. were measured. The production manager t

Post by answerhappygod »

2 The Times Required To Assemble A Common Circuit Board At Strampen Board Corp Were Measured The Production Manager T 1
2 The Times Required To Assemble A Common Circuit Board At Strampen Board Corp Were Measured The Production Manager T 1 (263.13 KiB) Viewed 38 times
Construct & draw a histogram and a scatter diagram of the
data. What suggestions would you give the production manager?
2. The times required to assemble a common circuit board at Strampen Board Corp. were measured. The production manager thought that the assembly times increased as the day progressed, due to worker fatigue. A typical worker was chosen and three assembly times were taken and averaged for each hour of the workday over a period of 5 workdays. These averages are provided as below: Co. Strampen Board Process Times Observation (hourly) DAY4 1 1 2 3 Time (minutes) DAY1 1.0 1.2 1.3 1.5 1.3 1.8 1.9 1.9 4 DAY2 1.3 1.1 1.5 1.8 1.3 1.4 1.5 1.9 DAY3 1.2 1.6 1.3 1.2 1.7 1.6 1.4 1.7 DAYS 1.4 1.6 1.3 1.4 1.8 1.4 1.9 1.2 1.2 1.1 1.5 1.7 1.4 1.9 1.8 5 00 a 7 8 AVG 1.4875 1.475 1.4625 1.45 1.5
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply