The standard costs and actual costs for factory overhead for the manufacture of 2,600 units of actual production are as
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
The standard costs and actual costs for factory overhead for the manufacture of 2,600 units of actual production are as
The standard costs and actual costs for factory overhead for the manufacture of 2,600 units of actual production are as follows: Standard Costs Fixed overhead (based on 10,000 hours) 3 hours per unit at $0.74 per hour Variable overhead 3 hours per unit at $2.00 per hour Actual Costs Total variable cost, $18,200 Total fixed cost, $8,200 The fixed factory overhead volume variance is Ca. 51,302 favorable Ob. 50 Oc. $1,302 unfavorable Od $1.628 unfavorable